A municipality-approved gateway to high-yield renewable energy assets in the Eastern Cape
The Dr Beyers Naudé Local Municipality SSEG Programme offers investors a structured, de-risked pathway to deploy PV and BESS assets — anchored by 71.60 GWh of verified annual consumption and an Eskom bill exceeding R212 million.
Annual Bulk Consumption
Across 9 Eskom supply points
Year 1 Eskom Baseline Cost
Jul 2023 – Jun 2024
10-Yr Cumulative Saving
Scenario B (Full BESS)
Eskom Tariff Escalation
RCA-confirmed trajectory
Why this programme creates compounding value
South Africa's 9%/yr Eskom tariff escalation against ~6%/yr fixed-cost renewable escalation produces a 3% annual differential — the primary engine of value creation across both phases.
3% Compounding Differential
9% Eskom escalation vs ~6% renewable cost escalation compounds to a 16.3pp saving improvement over the decade.
Materially De-Risked
Municipality pre-approved SSEG status, EIA exemptions and site readiness across the Phase 1 pipeline.
Inflation-Linked Cash Flows
BESS projects operate under lease structures with defined CPI+1% escalation — predictable investor returns.
Municipal Off-Taker
DBNLM acts as anchor off-taker for BESS arbitrage and PV energy services across nine supply points.
10-Year Eskom Cost Trajectory
Baseline vs Scenario B (Full BESS) vs Scenario C (Evening BESS). Eskom escalation 9%/yr, PV+BESS 6%/yr.
Consumption by TOU Period
71.60 GWh across nine supply points (Jul 2023 – Jun 2024)
Annual Saving — Scenario B (Full BESS)
Year-on-year cost avoidance vs the Eskom baseline, growing from R56.65M (Yr 1) to R198.38M (Yr 10).
Combined PV + BESS system performance
Scenario comparison against the no-PV/BESS baseline, drawn from the verified engineering design.
| Metric | Scenario B | Scenario C | Baseline |
|---|---|---|---|
| Annual Eskom Cost (Year 1) | R156.19M | R184.37M | R212.83M |
| Year 1 Saving vs Baseline | R56.65M (26.6%) | R28.46M (13.4%) | — |
| Year 10 Annual Saving | R198.38M (42.9%) | R150.76M (32.6%) | — |
| 10-Year Cumulative Saving | R1,174.9M | R803.4M | — |
| 10-Year Total Eskom Spend | R2,058.7M | R2,430.2M | R3,233.6M |
| Aggregate Saving (10 yr) | 36.3% | 24.8% | — |
| PV Capacity | 28.8 MWp | 28.8 MWp | — |
| BESS Capacity | 126.5 MWh / 18.5 MW | 54.0 MWh / 8.0 MW | — |
Immediately deployable project suite
Phase 1 Total BESS Capacity
4 deployable projects
Phase 1 Total PV Capacity
2 DoT projects
BESS Project IRR Range
15-year term
Phase 1 Total CapEx
BESS + PV combined
Confidential — for authorised recipients only. This dossier contains commercially sensitive financial, engineering and strategic information. Distribution is restricted to authorised recipients under NDA. Produced by Utility Consulting Solutions (Pty) Ltd on behalf of Dr Beyers Naudé Local Municipality, June 2026.
